Requirements engineering for iteration 1 is finished (D13); phase 2
(planning and design) starts.

Co-Authored-By: Claude Opus 5.5 <noreply@anthropic.com>
2026-10-05 19:13:49 +02:00

63 lines
2.6 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
# Progress
Where the project stands, and what happened in each session. Newest first. The process is in
CLAUDE.md ("Working rules").
## Current state
- **Iteration 1, phase 2 (planning and design) started.** Phase 1 is approved (D13);
[REQUIREMENTS.md](REQUIREMENTS.md) is the baseline.
## Next steps
Phase 2 for the MVP scope (D8: MQTT connection + discovery + availability, the MVP sensors, a
basic notification). Design topics, proposed order:
1. Q4: MQTT client library (licence, availability on SteamOS, TLS/login, Qt event-loop
integration, deployment).
2. Component structure: configuration, MQTT/discovery layer, sensor sources, notification
service; how they fit into `Dashboard` (the app class).
3. HA entity model: topics, discovery payloads, availability, device grouping (CON-2/3/5,
SEN-15).
4. Basic notification (NOT-1): needs an overlay outside the dashboard, i.e. the planned
`WorldOverlay` (CLAUDE.md, "Planned extension"); MVP placement to be decided.
5. Test strategy for the MVP and the measurement method for NFR-3.
Later, not needed for the MVP: Q1 (several notifications), Q2/Q3 (dashboard); check only
whether they constrain the MVP architecture.
## Log
### 2026-10-05: requirements approved
- User approved REQUIREMENTS.md including the priorities (D13). Phase 2 started.
### 2026-10-04/05: project set-up and requirements
- Copied the vrdashboard template. Removed what the app doesn't need:
- `examples/` (diagnostics app) and the `VRDASH_BUILD_EXAMPLES` option
- the Frame test package (`scripts/package-frame-test.sh`, `docs/FRAME-TESTING.md`,
screenshots)
- the demo UI (`src/qml/DemoPage.qml`)
`Main.qml` shows a placeholder card.
- Named the app **FrameAssistant**, "Steam Frame companion for Home Assistant":
- CMake project `frameassistant`, executable `frame-assistant`
- app key `net.matzman.frameassistant`, tab "Frame Assistant", QML module `FrameAssistant`
Names rejected:
- "Steam…" and "…Home Assistant": trademarks
- "HASS…": the user dislikes it, because "Hass" is German for hate.
- Agreed working rules (in CLAUDE.md):
- explicit permission for everything; ask instead of assuming
- iterative five-phase cycle; an informal "ok" approves a phase
- document everything in Markdown in `docs/`
- `git init`. Baseline commit `4a5b090`.
- Requirements engineering (several question rounds with the user). The results are in
REQUIREMENTS.md:
- decisions D1–D12
- 51 requirements
- research on OpenVR data sources (Appendix A)
- Checks: `native-debug` builds, `ctest` passes 6/6 (Vulkan surface test skipped, no Vulkan on
this host), `--snapshot` renders.